Partridge Partners

Portfolio Categories

Residential

Forensic and Remedial Engineering

Art and Innovation

Film Set, Exhibition and Event Structures

Facade and Glazing

Commercial and Institutional

Sustainability

Landscape Engineering

Facade and Glazing

2 Help Street, Chatswood

2 Help Street, Chatswood

Property Manager: Henderson & Horning Property Consultants
Project Manager: Craig Barry

Partridge Partners were engaged to prepare a report on the condition of the building concrete façade and windows. Partridge Partners prepared a scope of works for concrete cancer repairs and a methodology for sealing the original windows incorporating a façade improvement. Remedial works are expected to be completed in 2009 under Partridge Partners supervision

33 Berry Street, North Sydney

33 Berry Street, North Sydney

Property Manager: CBRE North Sydney
Project Manager: Eamonn Madden

Partridge Partners prepared a structural report on the concrete façade and the ‘Plasteele’ (plastic coated steel framed windows) and a scope of works for rectification of concrete cancer opening up joints between precast concrete façade panels and replacing all windows in the building.

Glazed Shopfront Certification

Glazed Shopfront Certification

Partridge Partners provide design advice and certification of glazed shop fronts to shop fitout clients and glazing sub-contractors.

Our designs include full height glass fins, cantilevered glass fins with sliding brackets, toughened glass assemblies and fully framed shop fronts.

Locations:

Westfield – Chatswood, Bondi Junction, Miranda & Burwood.

Chatswood Chase

Macquarie Shopping Centre 

26 Storey Overcladding, Elcom Building

26 Storey Overcladding, Elcom Building

Project Manager: Eamonn Madden

Contractor's facade consultant to detail and supervise aluminium overcladding for all external elements.

More detail on this project

299 Elizabeth Street, Sydney

299 Elizabeth Street,  Sydney

 Property Manager: Burcher Property Group
Project Manager: Eamonn Madden

Survey, investigation, report, design of repairs, calling and letting of tenders for a defective 12-storey glass curtain wall.

56 Delhi Road, North Ryde

56 Delhi Road, North Ryde

Client: Arch System Fabrication
Project Manager: Eamonn Madden

Design and details for multi storey ‘Stick System' curtain wall

18 Jubilee Avenue, Warriewood

18 Jubilee Avenue, Warriewood

Project Engineer: Eamonn Madden

Design and detailing and site inspection and certification of curtain wall bracket support system.

Sydney Town Hall House

Sydney Town Hall House

Substantial modifications to the original fabric of the lower level, for fitout including demolition of original walls and new coffee shop.

Sydney Olympic SOCOG Headquarters, Broadway

Partridge Partners Pty Limited were the environmental consultant for the design team appointed by SOCOG for their $20.0m fit-out of the old John Fairfax building at Broadway,  Sydney.  The Ecological Specification Process proved to be very effective in achieving the environmental outcome and audit required by SOCOG.

Sydney Kingsford Smith Airport, Mascot

Departure lounge and retail shopping arcade modifications and upgrades.

Office Building, 1 York Street

Lobby refurbishment, including cutting back podium to provide higher car entry, new signage, landscaping and new awnings (completion due 2005).

National Australia Bank Headquarters, George Street, Sydney

Lobby refurbishment, ground floor façade modification and new café.

Australian National Maritime Museum

This was a major internal refit of the naval section requiring a new feature wall, new mountings for major displays of missiles, guns and radar, and new viewing platform cantilevered off existing public areas.

11-storey Office Refurbishment, Milsons Point

This refurbishment required floor strengthening to upgrade their capacity to meet present standards and tenant requirements.

13 Storey Office, Chatswood (Glass Curtain Wall)

Assessment & Report - Preparation of defence of a claim of over $20 million in the Supreme Court of NSW requiring detailed reporting on all structural and glazing aspects of a 14-storey glass and granite curtain wall and 2-storey suspended glass assembly.